Ductile Iron Grooved End Tee
video

Ductile Iron Grooved End Tee

Ductile iron grooved end tee, QT450-10 to ISO 2531, grooved Awwa C606 or push-on socket, DN25 to DN300 at Pn16/Pn25 (300 psi / 2.07 MPa), ISO and CE certified. Most go into fire protection and water supply.
We pack in wooden cases. FOB pricing runs US $4.9-6.8 per piece, minimum order 200 pieces.
Send Inquiry
Product Introduction

Ductile Iron Grooved End Tee

Grooved tee for fire and water mains

The ductile iron grooved end tee serves fire protection and water supply lines. It is a QT450-10 ductile iron body to ISO 2531; DN25 to DN300. The listed reference records the product type as Tee. The listed model reference is DI-GST-EQ. In service the body has to hold internal pressure and the modest external loads from clips, supports and occasional contact during maintenance, while the outside surface takes whatever corrosion practice the installation applies after the line goes into service. Contractors usually pull the bore, wall and end form from the spool list before the shop cuts the piece, so the batch matches the take-off rather than a mixed stock assortment. The route often turns again within the same block, so adjacent pieces are listed together on the same drawing sheet. The fitting is staged alongside the spool it joins.

Ductile iron grooved end tee for fire protection and water supply lines
Ductile iron grooved end tee staged for fire protection and water supply lines.

Ductile QT450-10 body to ISO 2531

How the material behaves under service depends on the medium carried and the environment around the line. The wall section carries internal pressure without permanent deflection, and the body flexes only slightly when bedding or supports settle under a settled line. Where the piece meets the atmosphere, surface condition is checked against the order record before packing, and any end that does not match the recorded bore is set aside rather than shipped with the batch. Over repeated temperature cycling and occasional wetting, the material keeps its dimensional stability, and the joint itself remains the part that needs the closest watching during the first pressure test. Buyers on a scheduled contract usually order several matching pieces in one slot so fabrication does not stop between sections of the same run.

Fitters ask this every week, and the answer comes from the drawing, not the catalog.

Grooved or push-on socket ends

The listed end form governs how the piece seats against the adjoining pipe. For welded preparations the bevel and outside diameter are matched flush to the mating tube before the joint closes, while threaded and socket-weld options follow the thread or socket profile recorded on the listing. A skewed insertion leaves one side under-sealed and usually shows weeping after the first hydrostatic check, so the crew seats the piece square and checks the joint angle before backfill or support clips go on. The joint has to stay aligned with the centerline pattern on the spool drawing, and the recorded dimension on each end is compared against that drawing before the piece leaves the shop. Where flanges are involved, bolts are pulled in cross sequence so the gasket compresses evenly around the full ring.

Protection and supply line placements

These pieces end up on fire protection and water supply lines. Around a station or plant the line routes between racks, decks, pump houses and individual units, and each section calls for the fitting that matches its own spool list. Small branches feed local take-offs while larger mains carry the main flow through open corridors and crossings, and the same body type appears in both sizes across the order record. Field crews stage the pieces along the trench or rack before stringing begins, sorting by nominal size so the right fitting reaches the right joint at the right moment. Local conditions such as cover depth, groundwater level and soil type narrow the size and class choice before the first length is laid in.

On site, the piece is staged alongside the spool it joins, and the crew checks nominal size, wall and end condition before the first connection is made. Supports and clips are placed so the body does not carry an unintended external load, and the joint is left accessible for the first pressure test and any later inspection. Where the run crosses a trench, chamber or rack, the fitting is aligned to the centerline pattern on the drawing rather than pulled straight by hand. Receiving inspection sorts the batch by size against the order reference, and any piece that does not match the recorded bore or end form is set aside instead of being mixed into the installed run. Spare pieces for future maintenance are held in store by bore and wall, separate from the current installation.

Size comes from the spool list. Wall follows the line rating. End form matches the adjoining run.

SectionRange
Model referenceDI-GST-EQ
Pressure ratingPn16 / Pn25, 300 psi / 2.07 MPa
Standard or certification recordISO, CE
Bore and size rangeDN25 to DN300
End connection formGrooved (Awwa C606) / socket push-on
Body materialQT450-10 Ductile Iron (ISO 2531)
Listed fitting typeGrooved End Tee
Product categoryTee
Intended serviceFire protection and water supply

Pressure record checked against design

When the order comes through, nominal size, wall and end condition are recorded on the sheet, and the shop cuts the piece to those dimensions before it moves to surface check and packing. The record lists the standard references ISO, CE; these are the only standards quoted for this piece, and any project specification beyond them should be checked separately. Custom dimensions are prepared to order instead of being pulled from a fixed stock bin, which is why the size band in the listing bracket stays wide across the range. One piece may open the order; standard lot timing and the price bracket are noted in the listing. Each piece in the batch carries the same order reference, which lets receiving inspection sort the pieces by size without opening every crate. Spare pieces for future maintenance are held in the store by bore and wall, separate from the batch installed on the current run.

Surface and end check come before packing. A fresh weld fails inspection most often because grit sat on the bevel.

Hot Tags: Ductile Iron Grooved End Tee, China Ductile Iron Grooved End Tee manufacturers, carbon steel industrial joint fittings, carbon steel pipe joint fittings, carbon steel plug fittings, carbon steel threaded connector fittings, pvc pipe fittings, Seamless Carbon Steel Elbow

Send Inquiry

whatsapp

Phone

E-mail

Inquiry