Ductile Iron 22.5 Degree Elbow
video

Ductile Iron 22.5 Degree Elbow

Ductile iron 22.5 degree threaded elbow, QT450-10, female x female BSPT/NPT, DN15 to DN150 at Pn16 / Class 150, to ISO2531, EN545 and GB/T 13295. Most go into water supply threaded piping.
We ship out quickly on standard sizes. FOB pricing runs US $0.68-0.95 per piece, minimum order 1,000.
Send Inquiry
Product Introduction

Ductile Iron 22.5 Degree Elbow

Shallow-threaded elbow for water lines

The ductile iron 22.5 degree threaded elbow serves water supply threaded piping. It is a Ductile iron QT450-10, Grade 65-45-12 body; DN15 to DN150. The listed reference records the product type as Elbow. The listed model reference is DI-T-E225. In service the body has to hold internal pressure and the modest external loads from clips, supports and occasional contact during maintenance, while the outside surface takes whatever corrosion practice the installation applies after the line goes into service. Contractors usually pull the bore, wall and end form from the spool list before the shop cuts the piece, so the batch matches the take-off rather than a mixed stock assortment. The route often turns again within the same block, so adjacent pieces are listed together on the same drawing sheet. The elbow is aligned to the centerline pattern on the drawing.

Ductile iron 22.5 degree threaded elbow for water supply threaded piping
Ductile iron 22.5 degree threaded elbow staged for water supply threaded piping.

Ductile QT450-10 body under service

How the material behaves under service depends on the medium carried and the environment around the line. The wall section carries internal pressure without permanent deflection, and the body flexes only slightly when bedding or supports settle under a settled line. Where the piece meets the atmosphere, surface condition is checked against the order record before packing, and any end that does not match the recorded bore is set aside rather than shipped with the batch. Over repeated temperature cycling and occasional wetting, the material keeps its dimensional stability, and the joint itself remains the part that needs the closest watching during the first pressure test. Buyers on a scheduled contract usually order several matching pieces in one slot so fabrication does not stop between sections of the same run.

The first joint sets the pattern; seat it square, then move on to the next.

Female-to-female BSPT and NPT threads

The listed end form governs how the piece seats against the adjoining pipe. For welded preparations the bevel and outside diameter are matched flush to the mating tube before the joint closes, while threaded and socket-weld options follow the thread or socket profile recorded on the listing. A skewed insertion leaves one side under-sealed and usually shows weeping after the first hydrostatic check, so the crew seats the piece square and checks the joint angle before backfill or support clips go on. The joint has to stay aligned with the centerline pattern on the spool drawing, and the recorded dimension on each end is compared against that drawing before the piece leaves the shop. Where flanges are involved, bolts are pulled in cross sequence so the gasket compresses evenly around the full ring.

Threaded water supply placements

These pieces end up on water supply threaded piping. Around a station or plant the line routes between racks, decks, pump houses and individual units, and each section calls for the fitting that matches its own spool list. Small branches feed local take-offs while larger mains carry the main flow through open corridors and crossings, and the same body type appears in both sizes across the order record. Field crews stage the pieces along the trench or rack before stringing begins, sorting by nominal size so the right fitting reaches the right joint at the right moment. Local conditions such as cover depth, groundwater level and soil type narrow the size and class choice before the first length is laid in.

On site, the piece is staged alongside the spool it joins, and the crew checks nominal size, wall and end condition before the first connection is made. Supports and clips are placed so the body does not carry an unintended external load, and the joint is left accessible for the first pressure test and any later inspection. Where the run crosses a trench, chamber or rack, the fitting is aligned to the centerline pattern on the drawing rather than pulled straight by hand. Receiving inspection sorts the batch by size against the order reference, and any piece that does not match the recorded bore or end form is set aside instead of being mixed into the installed run. Spare pieces for future maintenance are held in store by bore and wall, separate from the current installation.

Record the bore on the sheet. Match the wall to the duty. Keep spare pieces by size in store.

SectionRange
Body materialDuctile Iron (Qt450-10 / Grade 65-45-12)
Pressure ratingPn16 / Class 150
Standard or certification recordISO2531, EN545, GB/T 13295
Intended serviceWater supply threaded piping
Bore and size rangeDN15 to DN150
Product categoryElbow
Model referenceDI-T-E225
End connection formThreaded (BSPT / NPT), female x female
Listed fitting typeElbow

Casting record kept with the order

When the order comes through, nominal size, wall and end condition are recorded on the sheet, and the shop cuts the piece to those dimensions before it moves to surface check and packing. The record lists the standard references ISO2531, EN545, GB/T 13295; these are the only standards quoted for this piece, and any project specification beyond them should be checked separately. Custom dimensions are prepared to order instead of being pulled from a fixed stock bin, which is why the size band in the listing bracket stays wide across the range. A trial order can start with one piece; the listing records the production window and the price bracket for standard lots. Each piece in the batch carries the same order reference, which lets receiving inspection sort the pieces by size without opening every crate. Spare pieces for future maintenance are held in the store by bore and wall, separate from the batch installed on the current run.

Surface and end check come before packing. A fresh weld fails inspection most often because grit sat on the bevel.