Ductile Iron Cement Lined Water Pipe
Annual capacity is about 10,000 tons with a lead time around 20 days. The cement lining gives the pipe extra protection for sewage duty, and customized specifications are accepted.
Ductile Iron Cement Lined Water Pipe
Where the buried main takes the sewage run
The listed pipe goes into municipal sewage and wastewater mains where plain steel would corrode through within a few service cycles. Sewage, wastewater and the occasional corrosive groundwater that seeps into the trench both meet the inner bore and the outer coating during the burial life. Most of these lengths land around DN500 on city sewer projects, laid along road reserves, pump stations and treatment-plant connections rather than above-ground process skids. The ductile iron body carries internal pressure and trench loads, while the cement lining protects the wetted bore against aggressive effluent and prevents the tuberculation that shortens plain metal water runs. The joint family covers T-type, K-type and N-type push-in sockets alongside the flanged option, so the spool drawing can mix flexible sockets on straight runs and flanged adapters where a valve or branch meets the main. Water supply, gas supply and oil pipe are recorded as the listed usage sectors on the source entry, and the cement-lined body is matched to the sewage and wastewater duty described on this page. The listing records the dimensions, end forms and service sectors described in the sections below, and each piece is checked against the order record before it moves to surface inspection and packing.
Crews at the pit usually ask about settlement first. The flexible socket is what answers that question before the first length goes in.

What the cement lining sits against
The wetted surface meets the continuous fluid on the line, while the external shell only sees ambient moisture, occasional spray and the support loads from clips, hangers or bedding. Where mixed metals appear in the catalog family, the buyer confirms which metal contacts the fluid, because the outer shell and the wetted parts can differ on the same entry. The plain metal surface is supplied as formed; any paint, wrapping or extra coating follows the plant's own corrosion practice once the piece enters the line. Wall thickness carries internal pressure and the small external loads imposed during installation, and a casting or surface with visible flaws is set aside before assembly or release rather than mixed into the batch. Where the line carries grit, condensate or repeated thermal cycling, the buyer compares the seat, weld or thread condition at each inspection before the body itself is questioned, because the wear parts renew far cheaper than the casting.
The installation environment sets the finish and the inspection interval, since an indoor plant room, an outdoor rack and a buried trench each expose the body to a different mix of moisture and mechanical handling. Support spacing, clip loads and the local corrosion practice are recorded on the project drawing, and the piece is supplied to match those conditions rather than a one-size finish. Temperature cycling and occasional wetting around equipment connections are accounted for when the body grade and wall are chosen for the listed duty.
On paper it is one pressure number. In the trench it is three couplings, a gasket change and a backfill window to plan around.
Compare the spool list before closing the joint.
Socket and spigot joints across the trench
The fit-up is checked against the neighboring component before the joint closes: end form, thread pitch or bevel preparation must sit flush with the mating pipe, and a mismatch means an extra adapter, reducer or redo inside the cabinet, skid or trench. End protectors and wrapping stay on until the joint is ready to close, because grit on the thread, bevel or gasket face is the usual reason a fresh joint fails its first inspection. The order sheet records nominal size, wall and end condition, and the shop prepares each piece to those dimensions before surface check and packing. Alignment is checked again at receiving on site, where the end squareness and the mating bore are compared against the spool drawing before the line is closed.
Pressure class and the fields left open on the listing
The standard reference recorded on the listing is ISO2531, EN545, GB/T 13295. The working pressure band on record is Pn10, Pn16, Pn25, Pn40. The listing leaves some descriptive fields open where the source record carries no fixed value, and those entries are marked as such in the table rather than filled in by assumption. The rating is set against maximum pressure with surge included, not average running pressure, so a class picked on steady flow may weep when reversal or a pressure spike arrives on the line.
Leaving the shop for a municipal excavation
The record sheet travels with the batch. Each piece is checked for bore, wall, end squareness and surface condition before packing, and the record sheet follows it through the order. The packed batch is marked with the order reference so receiving inspection on site can match each piece to the spool list without opening every crate. Pieces that fail the end or dimension check go back to the shop rather than being mixed into the shipment. Spare pieces for future maintenance are held in the store by size and form, separate from the batch installed on the current run.
A small trial order is accepted where the listing allows. The recorded minimum stands at 100 pieces. The listed bracket runs US $800 per piece. Larger lots are scheduled against the shop capacity. Buyers usually send the full size list in one request so the batch can be scheduled together and delivered in one shipment rather than split across several production slots. Each piece in the batch carries the same order reference, which lets receiving inspection sort by size without opening every crate. Where a project needs several branches of the same OD and wall, the whole set is ordered together so fabrication does not stop between sections.
Compare the drawing to the listing before commitment, and confirm bore, end form and rating against the project piping specification once the order list is finalized.
| Entry | Figure |
|---|---|
| Bore and dimension band | - |
| Connection form accepted | T-Type, K-Type, N-Type and Flanged Type |
| Working pressure rating | Pn10, Pn16, Pn25, Pn40 |
| Standard reference on file | ISO2531, EN545, GB/T 13295 |
| Listed service sector | Water Supply, Gas Supply, Oil Pipe |
| Catalog product family | Ductile Iron Pipe |
| Listed product pattern | Ductile Iron Pipes |
| Body construction metal | Cement-Lined Ductile Iron |
| Model or designation on record | DN500 |
Hot Tags: Ductile Iron Cement Lined Water Pipe, China Ductile Iron Cement Lined Water Pipe manufacturers
You Might Also Like
Send Inquiry













