Carbon Steel Seamless Butt Weld Tee
We make about 3,000,000 pieces a year, lead time about 31 days. MOQ 1,000 pieces, FOB from US $0.8 per piece.
Carbon Steel Seamless Butt Weld Tee
How the equal branch splits the header
This tee takes a process header and opens a 90 degree branch off its side, so a secondary run can leave the main line without a separate weld-on nozzle or a fabricated branch made on site. The two run ends carry the main flow straight through, while the branch end sends flow to the side line; on an equal branch all three openings share the same nominal size, which keeps the branch matching the header diameter on the spool drawing. Fabricators place these tees in plant process lines where a takeoff has to split cleanly to equipment, a sub-header or a manifold. The butt weld ends fuse to matching pipe in a rigid joint, and the seam-free body removes the longitudinal weld that a fabricated branch would otherwise carry into the pressure envelope. The branch sits perpendicular to the run, and its centerline is aligned against the header when the spool is laid out on the fabrication bench. Where several takeoffs serve one equipment row, the fittings are spaced along the header to match the vessel nozzle positions.
Equal means the branch matches the header size. Reducer branches are a different part number.

Forged stock and wall schedules
The body is forged from ASTM A105, Q235 or 20# carbon steel depending on the line specification, and the wall comes in Sch40, Sch80 and Sch160 across the DN15 to DN600 bore range. Material choice follows the fluid, temperature and rating of the line, while the schedule follows the pressure and the code the project works to; heavier schedules appear on higher-rated sections, lighter ones on auxiliary and utility runs. Forging gives the branch a compact, solid body around the junction, where three openings meet at one stress concentration zone. Dimensions are worked to ASME B16.9, which sets the end-to-end and branch centerline lengths that fit-up crews use when laying out the spool. The tee body is inspected for forging laps and surface defects before the ends are prepared, and any defective casting or forging is rejected before it enters the machining stage.
Schedule and size are read off the drawing first. The order cannot be matched without both.
The butt weld end preparation
Each end ships with a beveled butt weld preparation matched to the mating pipe, so the welder can set the fitting in the spool, fit up the joint and run the weld without machining on site. The branch end takes the same preparation as the two run ends, which keeps the weld procedure consistent across all three joints. Before welding, the bevel and the adjacent band are cleaned of oil, rust and mill scale, and the OD is checked against the line pipe so the joint gap stays within the fit-up allowance. Fitters ask this every week: whether the branch end needs the same bevel as the header ends, and it does, on this equal branch. After fit-up the root pass, fill passes and cap follow the same weld procedure used for the straight spool sections.
Clean the band back past the heat-affected zone. Welds over mill scale do not hold inspection.
Pressure ratings behind the weld
The listing carries working pressure ratings of Pn10, Pn16 and Pn25 under ASME B16.9, selected with the wall schedule and the line fluid during design. The rating for a specific takeoff depends on size, wall, material and the code case the project follows, so the rated class on the order should be checked against the piping specification before fabrication. Certification records ISO and CE accompany the listing paperwork, and the fitting is logged against the order reference for receiving inspection. The pressure envelope stays continuous through the seamless body, with no branch seam inside the junction zone. Thermal expansion at the header and branch connections is accounted for in the plant flexibility study, and the fitting sits where the design puts the rigid junction in the rack layout.
Do not mix ratings across one header. A heavier fitting on a light line does not fix an under-rated neighbor.
Mill records and paperwork per piece
The standard lead time is 31 days for an order of 1–100 pieces; quantities above 100 pieces are negotiated against the shop schedule. The minimum order is 1,000 pieces, and the FOB bracket runs US $0.8–1 per piece, with the final figure tied to bore, schedule and material grade. Brand mark YH, origin China. Each packed batch carries the order reference and the material records listed on the sheet, so the fabricator can trace the forged body back to its heat when the pressure test or site audit asks for it. A piece without its record slows the receiving inspection, so the paperwork packet is checked before the crate leaves the shop.
| Entry | Figure |
|---|---|
| Fitting class | Tee |
| Body material | ASTM A105, Q235, 20# Carbon Steel |
| Listed model | - |
| Bore and wall | DN15–DN600; Sch40/80/160 |
| Joint form | Butt Weld |
| Pressure ratings | Pn10, Pn16, Pn25 (ASME B16.9) |
| Certification record | ISO, CE |
| Intended service | Pipe Fitting |
| Brand mark | YH |
| Country of origin | China |
| Delivery window | 31 days (1–100 Pieces); to be negotiated (>100 Pieces) |
| FOB price bracket | US $0.8–1 / Piece |
| Minimum order | Min. Order: 1,000 Pieces |
| Product type | Equal Tee |
Hot Tags: Carbon Steel Seamless Butt Weld Tee, China Carbon Steel Seamless Butt Weld Tee manufacturers, carbon steel adapter fittings, carbon steel industrial joint fittings, carbon steel pipe fitting, carbon steel pipe joint fittings, carbon steel process fittings, pvc pipe fittings
You Might Also Like
Send Inquiry














