Malleable Steel 45 Degree Pipe Bend
video

Malleable Steel 45 Degree Pipe Bend

Malleable steel 45 degree elbows, BSPT/NPT threaded or socket weld. Commonly used in building services pipe racks, HVAC lines and boiler connections.
Custom sizes are accepted and OEM is welcome. FOB pricing runs from US $1.8 per piece, minimum order 10 pieces.
Send Inquiry
Product Introduction

Malleable Steel 45 Degree Pipe Bend

Water, Air and Heating Lines in New Buildings

These 45 degree malleable steel pipe bends go to construction infrastructure sites: water, air and heating lines going into new buildings. BSPT or NPT threads mean the piece screws onto standard pipe on site, so a mechanical contractor asking for a box that matches their threaded line sizes receives exactly that. Most land in building services pipe racks, HVAC runs and boiler connections, where service lines rise through shafts, cross ceilings and connect to plant equipment. The 45° angle turns a run around a beam, a duct or a neighboring main without the sharp offset of a square bend. The source record does not list a pressure class, a certification number or a usage category, and those fields stay open in this description.

Mechanical contractors order by thread and bore first, angle second. A box mixed on those two points slows the whole floor.

Malleable Steel 45 Degree Pipe Bend
Malleable steel 45 degree pipe bend for building services water, air and heating lines.

Site Screw-On Assembly for Mechanical Contractors

On a construction site, lines are assembled floor by floor as the building closes in, and threaded bends let crews connect sections without welding equipment in a finished room. The socket weld option covers the sections where the services specification calls for welded joints, usually on higher-temperature or higher-temperature-risk runs. The piece screws onto the pipe taper, sealed with a compound or tape suited to water, air or heating medium. Wrenches go on the flat boss rather than the sweep, to keep the body from twisting and the opposite end from backing off. Bore and thread form on the packing list reduce sorting time when several service systems share the same delivery box.

Building Services Racks, HVAC and Boilers

Services racks in a corridor or plant room hold water mains, air lines and heating return pipes side by side, and the bends route each system around supports and crossing ducts. HVAC runs carry chilled or hot water to air handling units, with the 45° turns needed where a main drops into a riser or branches to a unit connection. Boiler connections include feed, return and blow-down style service lines, routed around the boiler casing and the adjacent pumps. Heating service puts the body through temperature cycling between cold standby and warm operation, and the line spec should state the medium before material selection is finalized. Outdoor exposed sections need an exterior finish chosen against local weather conditions.

Body Material and Bend Angle

Body material: Malleable Steel, described in the feature list as a malleable iron body for building services piping. Angle: 45 Degree. Model mark: 45 Degree Malleable Steel. Product family: Elbow. The casting is intended for ordinary threaded building-service practice; special media or conditions call for a separate review. Surface finish at delivery is plain unless an exterior coating is requested on the inquiry.

ParameterSetting
Minimum orderMin. Order: 10 Pieces
Delivery schedule-
Body materialMalleable Steel
Documented certification-
FOB unit priceUS $1.8-90 / Piece
Rating class-
Model mark45 Degree Malleable Steel
Applicable service-
Product familyElbow
Place of originChina
Fitting kindElbow
Angular specification45 Degree
Brand markYH
End connectionThreaded (BSPT/NPT) / Socket Weld

Supply Terms

FOB price: US $1.8-90 per piece across the listed size and end-type spread. Minimum order: 10 Pieces. Trademark: YH. Origin: China. Lead time and usage are open on the source sheet and confirmed against the purchase order.

Riser, Shaft and Plant Room Routing

Risers carry water, air and heating lines up through building shafts, and the bend at each riser turn is set to clear the shaft wall, the ductwork running beside it and the neighboring service pipe that shares the same vertical space. Plant room layouts group boilers, pumps and tanks along one wall, with services running along the ceiling rack before dropping to each connection, and the 45 degree piece redirects the rack run around beams and ventilation ductwork that block a straight path. HVAC connections drop from the main riser to each air handling unit, and the bend on that drop is aligned so the valve and connection face the accessible side of the unit rather than the wall. Service lines in a new building are installed floor by floor, and the box of bends delivered to each floor is counted against that floor's takeoff before the next floor's materials are brought up. Exterior lines on the building face use the finish and insulation specified for local weather exposure, since the source record leaves coating unspecified.

Align valve handles to the accessible side during installation. Reaching around a duct later wastes a whole service visit.

Heating return and feed lines run in parallel between the boiler and the distribution riser, and the bends on those two lines are paired at the same offset so the insulation jackets can follow the common route. Air lines carry pressure drops across long runs, and supports near each turn keep the small-bore pipe from sagging between hangers as the building settles during its first heating seasons. When a future tenant subdivides a floor, the spare takeoffs marked on the riser should match the bore and thread form of the existing piece stock held in the building store.

Heating feed and return lines run in parallel between the boiler and the riser, and the paired bends on those two routes share the same offset so their insulation jackets follow a common path up the shaft. Air lines drop from the main distribution to local branches, and supports near each turn keep the small-bore pipe from sagging between hangers after the building settles through its first heating seasons. A future subdivision of a floor should match new takeoffs to the bore and thread form already held in the building store.

Hot Tags: Malleable Steel 45 Degree Pipe Bend, China Malleable Steel 45 Degree Pipe Bend manufacturers, carbon steel industrial piping components, carbon steel pipe fitting, carbon steel plug fittings, pipe fitting kit, pvc pipe fittings, Seamless Carbon Steel Elbow

Send Inquiry

whatsapp

Phone

E-mail

Inquiry