Ductile Iron Split Repair Clamp
video

Ductile Iron Split Repair Clamp

Two-piece split ductile iron repair clamp for sewage, QT450-10 with blue epoxy, DN65 to DN1200 at Pn10/Pn16 (up to PN25). Most go onto sewage and wastewater lines for in-situ leak sealing.
We supply these in bulk. FOB pricing runs US $0.8-1 per piece, minimum order 1,000 pieces.
Send Inquiry
Product Introduction

Ductile Iron Split Repair Clamp

In-situ sealing on sewage and wastewater runs

This two-piece split ductile iron repair clamp seals sewage and wastewater lines in place, wrapping an exposed barrel where a leak has to be contained without removing the run. The listed range covers DN65 to DN1200, with a pressure envelope of Pn10 and Pn16 up to PN25. The split half shells draw together over a liner that compresses against the existing pipe surface, so no end has to be threaded or welded to place the clamp. The ductile iron body holds internal pressure and the bolt clamping loads while the liner seals the repaired section, and the wrap stays in service once bolts are torqued to the listed procedure.

Sewer crews fit the half shells first. The liner has to sit square around the barrel before bolts come tight.

Two-piece ductile iron wrap around the barrel

The body is ductile iron in a two-piece split wrap, a casting tough enough to clamp around an existing barrel without removing the line. The iron holds internal pressure and the clamping loads from bolts while the liner seals against the pipe surface, and the split design lets the crew place the half shells around the main rather than threading the fitting onto an end. Surface finish follows the listed epoxy condition; any touch-up coating is applied after the clamp is seated.

Before the piece leaves the plant, surface condition and dimensions are checked against the listing record, and any burr, casting flash or uneven thread is dressed back to the body profile. Wall thickness and outside diameter are sampled against the listed size range, and the end faces are protected with thread or end caps until the joint is ready to close. On site, crews brush grit from the bore and the sealing face before assembly, because sand or scale left on a thread or gasket seat is the usual reason a fresh connection weeps after the first pressure test. Spare pieces ride along with the next valve or fitting order, held in the maintenance store by line size and end type so the replacement matches the run it serves.

Ductile iron two-piece split repair clamp for sewage and wastewater pipe
Split repair clamp staged beside an exposed wastewater main.

Size range and pressure envelope

The listed size range reads DN65 to DN1200 on the source record. The listed pressure envelope reads Pn10 / Pn16 (up to PN25). The certification record on the listing is left open; no standard or certificate number is assigned in the source record. Listed service on the source record: Sewage and wastewater.

Dimension selection starts from the flow requirement on the line drawing, then narrows against pressure class, span length and the end form listed for that fitting. Where two sizes sit close on the range, the larger wall and diameter give margin against transient surge and support loads, while the smaller size keeps weight and cost down on branches that carry little flow. The drawing should fix outside diameter, wall thickness and end preparation before the order is cut, so the workshop does not guess at a dimension that falls outside the listed stock range. Spare sets are held in the maintenance store tagged by line size, end form and pressure class, which keeps the replacement matched to the run it serves. On installation, supports and hangers follow the span conditions listed for that pipe. The joint is aligned square before bolts come tight or welds are laid down.

Clamp placement on an exposed main

The body wraps around the barrel in two split halves, a full wrap that covers the pipe circumference where the seal sits. Bolts draw the two shells together over a liner that compresses against the existing pipe surface, and the split design means no end has to be threaded or welded to place the clamp. The wrap stays in service as a permanent seal on the repaired section once the bolts are torqued to the listed procedure.

How the joint behaves under service depends on the end form chosen for that line. Welded ends fuse into a rigid connection that moves with the pipe, but they need a qualified weld procedure, joint fit-up and post-weld inspection as the quality plan requires. Threaded ends come apart with standard tools, which keeps maintenance simple on small-bore branches, while grooved and push-on seats rely on gasket compression to seal under pressure and allow a small angular deflection after laying. Each end family suits a different line, and the choice follows the spool list rather than a default picked at the warehouse counter.

SectionRange
Listed size rangeDN65 to DN1200
Product categoryDrainage Pipe
Pressure ratingPn10 / Pn16 (up to PN25)
Model reference-
End connectionSplit two-piece / full wrap
Intended serviceSewage and wastewater
Body materialDuctile Iron
Section shapeRepair Clamp
Listed standard-

Bulk order and packing practice

The listed minimum order sits at Min. Order: 1,000 Pieces, and the FOB bracket runs US $0.8-1 / Piece. The delivery window is not fixed on the listing and is agreed with the buyer at order confirmation. Pieces carry the YH mark and ship from China, and custom dimensions are accepted where the line falls outside a standard stock range.

The listing leaves any open field to be confirmed against the project drawing; no certificate number or rating is assumed where the source record leaves it blank.

Sealing wraps on an exposed sewer main

On site, the piece is handled with a sling or soft cradle rather than dropped onto the rack, and the end protection stays on until the joint is ready to close. Support clips and hangers are spaced to the span conditions on the drawing, so the body does not sag under its own weight between anchors. Where the run crosses a trench, chamber or equipment tie-in, the fitting is aligned square before the joint is tightened or welded; a skewed seat leaves one side under-compressed and shows weeping once pressure comes on. Crews record the line size, end form and pressure class on the spares tag, so the next replacement pulled from the store matches the existing run.

Hot Tags: Ductile Iron Split Repair Clamp, China Ductile Iron Split Repair Clamp manufacturers, carbon steel adapter fittings, carbon steel industrial joint fittings, carbon steel industrial piping components, carbon steel pipe joint fittings, carbon steel plug fittings, pvc pipe fittings

Send Inquiry

whatsapp

Phone

E-mail

Inquiry