Freeze Proof DN65 Indoor Fire Hydrant
video

Freeze Proof DN65 Indoor Fire Hydrant

Indoor freeze proof fire hydrant for high rise buildings, SN65/SNW65/SNZ65/SNS65, DN65, flange or thread connection. Commonly serving indoor fire standpipes in high rise buildings.
We make about 10,000 pieces a month, lead time 3 to 15 days by quantity. MOQ from 1 piece, FOB US $13.5 to 39.4 per piece.
Send Inquiry
Product Introduction

Freeze Proof DN65 Indoor Fire Hydrant

Standpipe hydrants on high rise risers

This indoor fire hydrant mounts on the standpipe riser of a high rise building, set in a cabinet along the stairwell, corridor or refuge floor at the intervals the fire system layout specifies. The indoor class of unit stays dry between drills, paired with a hose roll and nozzle inside the same cabinet, and it serves vertical runs where water climbs the building through the riser rather than feeding an outdoor standing main. Listed application on the source record is high rise building service, and the compact body fits the wall recess without protruding into the walking line. Multiple risers in a tall building split hydrants by floor zone, each cabinet matched to the hose roll and nozzle stored beside it.

The stairwell cabinet repeats floor after floor. Each box holds its own matched hose and nozzle.

SN65, SNW65, SNZ65 and SNS65 variants

Four model references appear: SN65, SNW65, SNZ65 and SNS65. The base SN65 is the standard indoor hydrant body; the SNW65 variant carries a regulating function, the SNZ65 variant uses a rotary arrangement, and the SNS65 variant carries a double-outlet configuration. Buyers select the variant against the riser layout in the cabinet schedule, since a regulating body, rotary body or double-outlet body serves a different hydraulic role on the line. Model naming on the source record lists the same four variants, and the chosen type should match the drawing callout before supply. Spare bodies in the store follow the same variant codes, so maintenance replaces like for like.

One riser line, four body types. The drawing callout names which one goes in.

Freeze proof arrangement in stairwell boxes

The freeze proof arrangement suits indoor boxes exposed to cold stairwell conditions, unheated service cores and high rise locations where winter temperature drops toward freezing near external wall penetrations. The body drains or holds water in a way that avoids ice blockage after use, so the riser returns to service without a frozen barrel when the next drill or response arrives. Indoor placement keeps the unit away from road salt and weather, but cold damp still settles on exposed faces, and maintenance wipes the seal and checks valve movement on each cabinet visit. Body material carries no assigned value on the listing; pressure class and certification record are likewise open, and those fields follow the building fire system specification reviewed at tender stage.

Freeze proof DN65 indoor hydrant on a high rise standpipe
Indoor hydrant installed along a high rise stairwell riser.

DN65 bore with flange or thread ends

The specification lists a DN65 bore, and the joint type offers flange or thread connection at the riser take-off. Flanged ends bolt to a companion flange on the vertical main, while threaded ends screw onto a matching male take-off; the end form follows how the riser was built, and the cabinet schedule usually states which one each floor receives. End mismatch forces an adapter inside the wall recess, which crowds the box and adds a seal point, so the buyer confirms flange or thread against the riser drawing before ordering.

How riser cabinets pair across floor zones

Custom models are accepted when a riser layout calls for an outlet arrangement outside the standard variant list. Before packing, the end connection gets a protector and the valve rests closed; at receiving, check the body against the cabinet drawing and confirm the end form mates with the riser take-off.

What cabinet visits check on the indoor body

Each riser cabinet pairs the indoor hydrant with its own hose roll and nozzle, so the response pair stays together inside the box instead of being stored in a shared room down the corridor. The hydrant body mounts on the standpipe take-off at DN65, and the cabinet repeats along stairwells, corridor ends and refuge floors at the floor-zone intervals the high rise fire layout specifies. In a tall building the riser splits by zone, and each zone receives its own set of cabinets, so a maintenance job on one branch does not leave another floor without a matched connection. The freeze proof arrangement suits the cold stairwell conditions near external wall penetrations, where winter air can drop toward freezing even inside the building envelope. Body material, pressure class and certification record carry no assigned values on the listing, and those fields follow the riser specification reviewed at tender stage.

One cabinet, one hydrant, one matched hose roll. The pair stays together on each floor.

High rise maintenance cycles the indoor hydrant on each cabinet visit: the stem moves open and closed without binding, the seat shows no weep after a trial pressure check, and the end connection stays seated against the riser take-off. Cabinet door hinges, reel cradle and hose roll get checked in the same pass, because a blocked cabinet delays the response as much as a stuck valve does. Custom models are accepted when a riser layout calls for an outlet arrangement outside the four listed variants, and the end connection protector stays on until the body first couples to the take-off.

Each riser cabinet pairs the indoor hydrant with its own hose roll and nozzle, so the response pair stays together inside the box instead of being stored in a shared room down the corridor. The body mounts on the standpipe take-off at DN65, and the cabinet repeats along stairwells, corridor ends and refuge floors at the floor-zone intervals the high rise fire layout specifies. In a tall building the riser splits by zone, and each zone receives its own set of cabinets, so a maintenance job on one branch does not leave another floor without a matched connection. The freeze proof arrangement suits cold stairwell conditions near external wall penetrations, where winter air can drop toward freezing even inside the building envelope. Maintenance cycles the hydrant on each cabinet visit: the stem moves open and closed without binding, the seat shows no weep after a trial hold, and the end connection stays seated against the riser take-off. Body material, pressure class and certification record carry no assigned values on the listing, and those fields follow the riser specification reviewed at tender stage. A trial order can start with a small lot, and the price bracket and delivery window follow the quotation and the ordered quantity.

SectionRange
Product categoryFire Hydrant
Working pressure band-
Bore and outlet scheduleDN65
End connectionFlange or Thread Connection
Certification record-
Model referenceSN65 / SNW65 / SNZ65 / SNS65
Body composition-
Listed unit classIndoor Fire Hydrant
Listed applicationHigh Rise Building

Hot Tags: Freeze Proof DN65 Indoor Fire Hydrant, China Freeze Proof DN65 Indoor Fire Hydrant manufacturers, Corrosion resistant Outdoor Fire Hydrant, fire hydrant distribution system, fire hydrant key, Indoor Fire Hydrant, Outdoor Fire Hydrant, Underground Fire Hydrant

Send Inquiry

whatsapp

Phone

E-mail

Inquiry